[Floor2] floor
Susan Clausen
susan at as220.org
Tue Nov 7 14:26:01 EST 2006
This coming Friday through Monday we are going to have the landings in the
AS220 stairway refinished. We will not be able to use the stairs from
Friday through Monday and will have to use the stairway at the Perishable
theater end of the building.
I will put a key in an envelope under each 2nd and 3rd floor tenants door
for the bottom stairway door. Your inside landing key will work at either
end of the hall. If you don't get the key by Friday because you have not
been in your studio this week, there is one at the bar the house managers
are using so please return it to the bar if you use it.
I have keys, for those employees who need them; just let me know. The door
directly on the street is not locked.
I have been asked to collect the keys after the floor is done.
THANKS
Susan
More information about the Floor2
mailing list